Acquired intellectual property rights

We introduce some of the intellectual property rights we have acquired as follows.

Patent Number(JP)Registration DateInvention (Abbreviation)1) Eligible Function
2) Customer value of this function
JP7537051August 9, 2024Plant Maintenance Work Attention Level Change System, Method for Changing Plant Maintenance Work Attention Level, and Program1) The color and shape of icons placed on plant maintenance drawings can be changed according to the work status.
2) The maintenance work status can be grasped on the drawing data, and the overall optimization of plant operation can be realized by improving the efficiency of information transmission.
JP7507987June 20, 2024Synthetic image generation system, synthetic image generation method and program1) Electronic blackboards can be created in batches from information in table format and synthesized when photographs are taken.
2) By creating a large number of electronic blackboards at once, the time required to create blackboards, which used to be done individually, can be significantly reduced.
JP7389941January 23, 2024Construction Inspection Result Form Output System, Construction Inspection Result Form Output Method, and Program1) By embedding tags in the construction form template in advance, the layout can be freely changed and the construction inspection results can be output as reports.
2) On-site clerical work for form preparation can be streamlined by 20% to 30%.
JP7389941November 21, 2023Drawing update system, drawing update method and program1) When a construction drawing is updated, the system can automatically visualize the updated part, switch between and display the construction drawings before and after the update, and take over icons/memos/photos, etc.
2) The updated parts of construction drawings can be visualized.
JP7320693July 26, 2023Electronic Small Blackboard Output System, Judgment Result Output Method and Program1) Automate the process of cutting out specific areas from a detailed drawing of a building structure.
2) Eliminates the need to manually create electronic blackboards.
JP7316483July 19, 2023Judgment Result Output System, Judgment Result Output Method and Program1) The system can automatically make a pass/fail judgment on whether the actual measured values of construction management items meet the construction standards for each area of a building.
2) It is possible to grasp the pass/fail judgment for each building area at a glance.
JP7309103July 6, 2023Pass/Fail Judgment System, Pass/Fail Judgment Method and Program1) The system can automatically make a pass/fail judgment on whether the actual measured values of construction management items meet the construction standards for each type of work.
2) It is possible to grasp the pass/fail judgment for each construction type at a glance.
JP7267523April 21, 2023Detail Drawing Cutout System, Detail Drawing Cutout Method and Program1) Automate the process of cutting out specific areas from a detailed drawing of a building structure.
2) Automates the process of cutting out specific detailed drawings from building structural drawings, significantly reducing the amount of time and labor previously performed manually.
JP7167386October 28, 2022Title of invention (abbreviation): Output system for contents of remarks, method for outputting contents of remarks, and program1)Linking construction drawing data, inspection checklists, and information on the status of corrective actions for items pointed out for correction, and centrally managing these items.
2) Improve the efficiency of construction quality control operations.
JP7159513October 14, 2022Indication contents output system, content output method and program1) Automate the process from symbol recognition to inspection icon placement on building structural drawings through machine learning.
2) Automate the mapping of detailed drawings to architectural drawings, significantly reducing the time and effort previously spent on manual work.
JP7177964November 15, 2022
JP7129586August 24, 2022The BIM data providing system, the BIM data providing method, and program1) Convert a 3D model BIM (Building Information Modeling) to 2D architectural drawings, record construction progress on the architectural drawings, and then convert them back to BIM again without loss or disconnection of data.
2) While the entire construction process is managed by BIM, the construction site can be managed using conventional architectural drawings.
JP7121215August 8, 2022To provide a construction work management system and a construction work management method and program1) Work instructions and completion reports can be made based on the construction system at the construction site.
2) Digitalization of information sharing between operators at construction sites is realized, enabling smooth communication even in complex instruction and order systems.
JP7129584August 24, 2022
JP7015412January 25, 2022Construction image shooting instruction system, construction image
Shooting instruction method and program (delete shooting instruction)
Photography instructions are issued on the construction drawing data, and once the photograph or video is placed, the photography instructions are deleted.
2) Photography or video recording, which is important in construction records, does not depend on the skill level of the photographer and improves recording quality standards.
JP7030251February 24, 2022Construction image placement system, construction image placement method and program (display of number of photos)1) The number of photographs, or the number of videos are displayed on the construction drawing data.
2) Prevent omissions and omissions of the required amount of records by displaying the required number of photos or videos in the construction record.