Acquired intellectual property rights
We introduce some of the intellectual property rights we have acquired as follows.
Patent Number(JP) | Registration Date | Invention (Abbreviation) | 1) Eligible Function 2) Customer value of this function |
---|---|---|---|
JP7320693 | July 26, 2023 | Electronic Small Blackboard Output System, Judgment Result Output Method and Program | 1) Automate the process of cutting out specific areas from a detailed drawing of a building structure. 2) Eliminates the need to manually create electronic blackboards. |
JP7316483 | July 19, 2023 | Judgment Result Output System, Judgment Result Output Method and Program | 1) The system can automatically make a pass/fail judgment on whether the actual measured values of construction management items meet the construction standards for each area of a building. 2) It is possible to grasp the pass/fail judgment for each building area at a glance. |
JP7309103 | July 6, 2023 | Pass/Fail Judgment System, Pass/Fail Judgment Method and Program | 1) The system can automatically make a pass/fail judgment on whether the actual measured values of construction management items meet the construction standards for each type of work. 2) It is possible to grasp the pass/fail judgment for each construction type at a glance. |
JP7267523 | April 21, 2023 | Detail Drawing Cutout System, Detail Drawing Cutout Method and Program | 1) Automate the process of cutting out specific areas from a detailed drawing of a building structure. 2) Automates the process of cutting out specific detailed drawings from building structural drawings, significantly reducing the amount of time and labor previously performed manually. |
JP7167386 | October 28, 2022 | Title of invention (abbreviation): Output system for contents of remarks, method for outputting contents of remarks, and program | 1)Linking construction drawing data, inspection checklists, and information on the status of corrective actions for items pointed out for correction, and centrally managing these items. 2) Improve the efficiency of construction quality control operations. |
JP7159513 | October 14, 2022 | Indication contents output system, content output method and program | 1) Automate the process from symbol recognition to inspection icon placement on building structural drawings through machine learning. 2) Automate the mapping of detailed drawings to architectural drawings, significantly reducing the time and effort previously spent on manual work. |
JP7177964 | November 15, 2022 | ||
JP7129586 | August 24, 2022 | The BIM data providing system, the BIM data providing method, and program | 1) Convert a 3D model BIM (Building Information Modeling) to 2D architectural drawings, record construction progress on the architectural drawings, and then convert them back to BIM again without loss or disconnection of data. 2) While the entire construction process is managed by BIM, the construction site can be managed using conventional architectural drawings. |
JP7121215 | August 8, 2022 | To provide a construction work management system and a construction work management method and program | 1) Work instructions and completion reports can be made based on the construction system at the construction site. 2) Digitalization of information sharing between operators at construction sites is realized, enabling smooth communication even in complex instruction and order systems. |
JP7129584 | August 24, 2022 | ||
JP7015412 | January 25, 2022 | Construction image shooting instruction system, construction image Shooting instruction method and program (delete shooting instruction) | Photography instructions are issued on the construction drawing data, and once the photograph or video is placed, the photography instructions are deleted. 2) Photography or video recording, which is important in construction records, does not depend on the skill level of the photographer and improves recording quality standards. |
JP7030251 | February 24, 2022 | Construction image placement system, construction image placement method and program (display of number of photos) | 1) The number of photographs, or the number of videos are displayed on the construction drawing data. 2) Prevent omissions and omissions of the required amount of records by displaying the required number of photos or videos in the construction record. |